Advanced Integrity Campus

New Construction of a 15,690 SF One-Story PEMB with Office and Assembly Space and 11,878 SF PEMB with Warehouse and Lab Space

Location

Magnolia, TX

Delivery

How this one came together

Site work, shell and finish out were coordinated before a single truck hit the site, which is the whole point of design-build.

The crane building drove the structure, so the foundations and frame were engineered around the loads first.

/ Dirt work
/ Crane building
/ Shell and finish out

Project Gallery

Photos from our own crews on this job, in the order the work happened.

See more Industrial & Warehouse projects

Metal buildings & metal stud buildings

Grimes Crane Building

New Parking Area and New Construction of 11,000 SF Crane-Serviced Pre-Engineered Metal Building
Tomball, TX
Build-to-suit

Phillips Cleaning Service

New Construction of 7,000 SF Pre-Engineered Metal Building for Office and Warehouse Space
Tomball, TX
Design-build

Falcon Packaging & Converting

New Construction of a Ground-Up 20,701 SF Storage Facility with Second Story of Offices
Houston, TX

Let's talk about your building

Tell us what you are trying to build. We will tell you honestly whether design-build or build-to-suit gets you there for less.